All projects

Mount Albert · Drainage

A complex drainage chamber install in Mount Albert

An aerial view of a construction site with an excavator lifting a concrete plate onto a drainage chamber while a worker guides the plate.
An orange Kubota excavator digging at a construction site next to a white house, with white pipes and a drainage chamber nearby.

Our drainage team has been working hard in Mount Albert, and the shared photos are just a small snapshot of the complex job they wrapped up. What looks straightforward from above is the result of careful planning, technical skill, and a coordinated effort across multiple teams.

Drainage project key steps

  • We excavated for a 1800mm wide concrete chamber.
  • Used the rock breaker to break up magma.
  • Stepped down the sides to maintain safety and prevent collapse as the excavation exceeded 1.5 metres.
  • Levelled the base and carefully lowered the chamber into place with the help of Hirepool.
  • Completed three 200mm concrete cores to create the required openings.
  • Intorock Drilling Ltd thrusted three holes and executed a thorough water test to ensure the required flow rate for the soakage test.
  • Finally, the lid was placed and the area was backfilled and compacted.

A big thank you goes out to Origin Build for the smooth collaboration and for being great project managers!

Next project

Māngere Bridge: A Māngere Bridge kitchen renovation, shining like new

Get in touch today

Need a job done?

Have a question, need a quote, or require a plumber? Our Auckland team is here to help, available 24/7.

022 159 2013info@statelyplumbing.co.nz

Service area: Auckland & surrounding areas. Residential, commercial, plumbing, gasfitting & drainage.

0 of 600 characters

Urgent? Call 022 159 2013, 24/7.

Call 24/7Request a quote